Kairos scheduling handbook

Learn the schedule. Defend the decision.

A practitioner-built handbook for the people who plan, review, update, and rely on construction schedules—from CPM mechanics to delay analysis.

Complete handbook

Explore every guide by topic.

Filter the library or scan the full index. Every page links to the references used to frame it.

46 guides · 6 topics
Topic
Role
Scheduling fundamentals

Critical path method (CPM)

The calculation behind nearly every construction schedule — and what "critical" actually means.

Foundation · 8 min read
Scheduling fundamentals

Total float (and free float)

How far an activity can slip before the project finish moves — and why float is where schedules get gamed.

Foundation · 6 min read
Scheduling fundamentals

Baseline schedule

The approved plan every later update is measured against — and the document delay disputes come back to.

Foundation · 7 min read
Scheduling fundamentals

Data date

The "as-of" line in a schedule update — everything before it is history, everything after it is forecast.

Foundation · 2 min read
Scheduling fundamentals

Logic ties and lags

FS, SS, FF, SF and the lags between them — the relationships that make a schedule a network instead of a list of dates.

Foundation · 2 min read
Scheduling fundamentals

Work breakdown structure (WBS)

The hierarchy that decomposes a project’s scope into the levels a schedule — and its reporting — hangs from.

Foundation · 2 min read
Reading a schedule

Schedule quality

Whether a schedule can be trusted as a forecast — judged from its mechanics, not its promises.

Intermediate · 2 min read
Reading a schedule

Negative float

What it means when a schedule reports less than zero slack — and why it demands an answer, not a shrug.

Intermediate · 2 min read
Reading a schedule

Schedule constraints

Date pins that override logic — sometimes necessary, often a way to make a schedule say what someone needs it to say.

Intermediate · 2 min read
Reading a schedule

Out-of-sequence progress

Work reported in a different order than the logic says — a small flag that often reveals a plan no longer being followed.

Intermediate · 2 min read
Reading a schedule

How to review a contractor schedule update

A monthly schedule update review for owners and owner’s reps: check the data date, progress, model changes, critical path and float, then record a decision.

Intermediate · 7 min read
Reading a schedule

Look-ahead schedule

The two-to-six-week slice of the plan used to run the work — where the master schedule meets the field.

Intermediate · 2 min read
Delay & claims

Delay claims, explained

Excusable, compensable, and critical delay—distinct questions that must be tested against the contract, facts, and governing law.

Advanced · 7 min read
Delay & claims

Concurrent delay

When owner and contractor delays overlap — the most contested question in delay analysis.

Advanced · 2 min read
Delay & claims

Time impact analysis (TIA)

A forward-looking method for modeling an event, inserting it into an appropriate contemporaneous schedule, and comparing the calculated effect.

Advanced · 2 min read
Delay & claims

As-planned vs as-built analysis

The retrospective comparison of what was promised against what happened — intuitive to show, hard to prove causation with.

Advanced · 2 min read
Delay & claims

Fragnet

A small network fragment modeling one change or delay event, inserted into the schedule to measure its effect.

Advanced · 2 min read
Delay & claims

Extension of time (EOT)

A contractual mechanism for adjusting a completion obligation when the governing agreement permits time relief.

Advanced · 2 min read
Metrics & oversight

Schedule performance index (SPI)

Earned value’s schedule ratio — a useful trend and a dangerous single number.

Intermediate · 2 min read
Metrics & oversight

Earned value, in plain terms

PV, EV, AC and the ratios built on them — progress measured in value rather than dates.

Intermediate · 2 min read
Metrics & oversight

Float consumption

Tracking how fast a path’s slack is being spent — the earliest honest warning most schedules give.

Intermediate · 2 min read
Metrics & oversight

DCMA 14-point assessment

A widely referenced schedule-mechanics screen—what the fourteen measures catch, and why thresholds are not acceptance criteria.

Intermediate · 2 min read
Metrics & oversight

Schedule compression: crashing and fast-tracking

The two levers for recovering time — paying for speed, or accepting overlap risk — and what each does to a schedule.

Intermediate · 2 min read
Metrics & oversight

Schedule risk analysis (Monte Carlo)

Replacing single-point durations with ranges to see the odds behind a finish date.

Intermediate · 2 min read
Primavera P6 operations

P6 Professional interface orientation

A professional map of the Projects and Activities workspaces—what each pane controls and where to verify the schedule.

Foundation · 3 min read
Primavera P6 operations

Create and govern a P6 project

Set up the EPS location, project identity, dates, calendar, defaults, security, and coding before detailed planning begins.

Foundation · 3 min read
Primavera P6 operations

Build and audit P6 calendars

Create project calendars, define shifts and exceptions, assign them deliberately, and verify their effect on dates and durations.

Foundation · 2 min read
Primavera P6 operations

Structure WBS and activity codes in P6

Create a scope hierarchy and controlled coding system that supports planning, responsibility, reporting, and exchange.

Foundation · 2 min read
Primavera P6 operations

Create activities, types, and durations in P6

Turn scope into measurable activities with stable IDs, clear names, suitable types, calendars, duration types, and progress rules.

Foundation · 2 min read
Primavera P6 operations

Build and verify logic in P6

Create predecessor and successor relationships, inspect driving ties, control lags, and eliminate unsupported open ends.

Intermediate · 2 min read
Primavera P6 operations

Set the data date and schedule a P6 project

Run a controlled F9 calculation with the right data date, options, completion condition, and retained schedule log.

Intermediate · 3 min read
Primavera P6 operations

Create, assign, and protect P6 baselines

Capture the accepted plan, assign the correct comparison baseline, display it, and control later updates or replacements.

Intermediate · 3 min read
Primavera P6 operations

Status and update a P6 schedule

Collect defensible actuals, reforecast remaining work, advance the data date, calculate, compare, and publish a complete update record.

Intermediate · 3 min read
Primavera P6 operations

Build professional P6 layouts, filters, and reports

Create controlled views for planning, status, critical paths, baseline comparison, quality review, and stakeholder reporting.

Intermediate · 3 min read
Primavera P6 operations

Run and disposition P6 Check Schedule

Screen logic, lags, constraints, float, durations, progress, baselines, closed-project links, and out-of-sequence work.

Intermediate · 2 min read
Primavera P6 operations

Import, export, and validate P6 XER files

Exchange native schedule data without losing lineage, overwriting global data blindly, or mistaking a successful import for parity.

Advanced · 3 min read
Primavera P6 operations

Assign resources and costs in P6

Load resources, roles, units, rates, expenses, and accrual rules without allowing calculation settings to rewrite the plan silently.

Advanced · 3 min read
Primavera P6 operations

Calculate multiple float paths in P6

Expose the controlling and near-controlling paths to a selected milestone instead of reporting one critical chain only.

Advanced · 3 min read
Best-practice playbooks

Schedule basis memorandum

Document the planning rules, assumptions, calendars, coding, logic, resources, constraints, and calculation settings behind the schedule.

Foundation · 2 min read
Best-practice playbooks

Construction calendar governance

Control workweeks, shifts, holidays, weather, possessions, shutdowns, and P6 assignments as managed schedule data.

Intermediate · 2 min read
Best-practice playbooks

How to review and accept a baseline schedule

How owners review and accept a contractor baseline schedule: completeness, contract dates, scope, logic, calendars, quality exceptions and a recorded decision.

Advanced · 4 min read
Best-practice playbooks

Monthly schedule update governance

Operate a repeatable cutoff, status, change, calculation, review, response, and approval cycle.

Intermediate · 2 min read
Best-practice playbooks

Schedule change-control playbook

Separate progress from revisions, authorize consequential edits, preserve before-and-after files, and keep the baseline yardstick intact.

Advanced · 2 min read
Best-practice playbooks

Schedule quality thresholds and exception management

Set project-specific screening thresholds, investigate exceptions, and trend the quality of the native schedule without gaming the score.

Intermediate · 2 min read
Best-practice playbooks

Schedule recovery-plan playbook

Convert a missed forecast into specific, resourced, risk-tested actions with measurable recovered days and approval gates.

Advanced · 2 min read
Best-practice playbooks

Schedule records and audit-trail handbook

Preserve native files, calculations, narratives, evidence, comments, decisions, and exchanges so future reviews can reconstruct what happened.

Foundation · 2 min read
Kairos platform + professional training

Bring the handbook into your team’s operating practice.

See how Kairos connects native schedules, reviews, evidence, and decisions—or build consistent capability through role-based training for scheduling professionals.

Team workshopsP6 operating labsReview-standard calibration

Review the Academy’s sources, editorial standards, and professional limitations →

See the idea in action

A few minutes.
A clearer next step.

Explore all video guides