Logic ties and lags

FS, SS, FF, SF and the lags between them — the relationships that make a schedule a network instead of a list of dates.

Working definition

Logic ties are the relationships that connect activities into a network: finish-to-start (finish digging, then pour), start-to-start (start pouring, then start finishing behind it), finish-to-finish, and the rarely justified start-to-finish. Lags add waiting time inside a tie — cure the concrete for seven days before stripping forms. Together they are what CPM actually calculates on, which makes them the first place a reviewer looks and the easiest place to hide things.

Key takeaways

  • Finish-to-start is the default and should dominate a healthy schedule — it says the work happens in sequence.
  • A seven-day cure lag is fine.
  • Reviews look at the proportion of non-FS ties, the count and size of lags, redundant relationships, and open ends — activities missing a predecessor or successor.
01

The four ties, honestly used

Finish-to-start is the default and should dominate a healthy schedule — it says the work happens in sequence. Start-to-start and finish-to-finish model overlapping crews and are legitimate when the overlap is real. Start-to-finish is almost never the honest way to model construction work; when it appears, ask what it is doing.

02

When a lag is hiding an activity

A seven-day cure lag is fine. A forty-five-day lag labeled nothing is an invisible activity: it consumes time, carries no scope, shows no progress, and cannot be statused. Long lags are how work gets buried where reviews cannot see it. The discipline is simple — if it takes time and someone performs it, it should be an activity with a name, not a number on a relationship.

Negative lags (leads) deserve the same suspicion: "start the successor ten days before the predecessor finishes" is usually a modeling shortcut that scrambles the float math and confuses everyone reading the file.

03

What a reviewer checks

Reviews look at the proportion of non-FS ties, the count and size of lags, redundant relationships, and open ends — activities missing a predecessor or successor. High counts of any of these do not prove bad faith, but each one is a place where the printed dates and the real plan can quietly diverge.

Sources and scope

Follow the reference trail.

This guide is original educational commentary. Kairos reference records identify the source organizations, editions and scope behind this guidance. The original publishers retain their publications and rights.

10S-90: Cost Engineering TerminologyAACE International · checked 2026-08-01Scheduling projectsOracle · checked 2026-08-01Checking schedulesOracle · checked 2026-08-01Schedule Assessment Guide: Best Practices for Project SchedulesU.S. Government Accountability Office · checked 2026-08-01